Laserfiche WebLink
• 2002 Mnual Hydrologic Report Pape 3 <br />monitoring points. The ephemeral flow in Coal Creek is measured at culverts located <br />between the two refuse disposal areas, SWGS 06. These culverts provide a stable cross <br />section and are accessible throughout the year. The intermittent flow in Jerry Creek is <br />measured at the culvert near the Highline Canal, SWGS 08. Beginning July 1999, <br />instantaneous flows are to be monitored quarterly. Data taken during the Year are listed <br />on data pages SR-2 for Coal Canyon and SS-2 for Jerry Creek. <br />There were three seeps included in the hydrologic monitoring in 1995. The location of the <br />seeps are shown on the Hydrologic Monitoring Map. They are located adjacent to Coal <br />Canyon drainage and Jerry Creek. They are primarily evident by the white staining on the <br />hillsides from evaporation of the seeps. None of them flow to the creek channel but <br />generally evaporate within a couple of hundred feet of the source. On May 9, 2002 the <br />springs were all dry. The monitoring results to date are shown on data page ST-1. <br />There was no discharge from CDPS discharge points 005 thru 015 during the Year. These <br />outtalls cover sediment pond discharges. Discharge point 015 is permitted to allow <br />pumping water from the south end of the Roadside South Portal out the 2 West portals. <br />• Piping to this point will not be installed. Discharge point 016 is permitted for gravity <br />discharge from the northwest intake pool. It replaced outtalk 001 and 002 on March 31, <br />2002. <br />Discharge point 001 was primarily used as an overflow to a mine water system for the <br />preparation plant during mine operations. During March and April 2000, a discharge pipe <br />was installed from the No.2 South Mains sump to outtall 001. The routing of this 4-inch <br />diameter pipe is presented on permit Figure 14-6. The capacity of this discharge pipe is <br />about 75 gpm. Data page SD-16 presents the results of weekly monitoring on Outfall 001. <br />Flow ceased at discharge point 001 on March 31, 2002. <br />Discharge point 002 is water siphoned from the reclaimed Northwest Intake Portal at the <br />Roadside South Portals. Mine inflows that were not pumped to the preparation plantwere <br />routed to an abandoned portion of the mine for discharge from this point. The preparation <br />plantwas shutdown during December 1999 so all mine inflows in excess ofthose handled <br />by outtall 001, flow north to the lower portion of the mine where they are handled by the <br />siphon, outfall 002. Data page SE-11 presents a listing of water quality monitoring <br />performed at this site during the Year. The average TDS was about the same as last year. <br />The following table presents the average TDS measurements for outtall 002 for the last <br />• four water years. <br />