Laserfiche WebLink
J�p 7, <br />Private <br />Access \\ <br />Road \ <br />Main Quarry L\ V <br />Portal <br />Entry No. 1 <br />utility <br />Tunnel <br />Entry No. 2 <br />Cable Tower <br />Entry No. 3 1 <br />London Lode Claim <br />No. 4411 <br />Owner of claim and <br />marble: OMYA <br />Leased to Sierra <br />White Marble No. 3 <br />Placer Claim <br />No. 46218 <br />Owner: Sierra <br />Optioned by <br />Wilderness Land <br />Trust <br />Prospect <br />Tunnel No. 5 <br />Scale: 1 inch = 200 feet <br />C <br />�D <br />D— � \ <br />\\ C ` 1 <br />\i <br />Yule Lode No. <br />4530 <br />Owner: McIntyre <br />A - Generator <br />Trailer <br />B - Fuel <br />Tank <br />C - Waste <br />Piles <br />North <br />D - Access <br />Roads <br />E - Sediment <br />Control <br />\'. <br />Yule Creek <br />ANNUAL REPORT MAP <br />Sierra Minerals Corporation <br />Boundary <br />of Affected <br />Area <br />Quarry Water <br />Discharge Point <br />(Outfall 001) <br />White Marble No. 2 <br />Placer Claim <br />No. 46218 <br />Owner: OMYA <br />Leased to Sierra <br />Public <br />Access <br />Trail <br />New Discovery <br />Lode Claim No. <br />4411 <br />Owner: OMYA <br />Leased to Sierra <br />Date: August 2000 <br />Approved by Rex E. Loesby <br />Colorado Registered Professional Engineer Number 20338 <br />2 <br />IIII IN <br />0 hsa: <br />