Laserfiche WebLink
remaining wood be removed prior to backfilling. Attached are photos verifying this <br />certification. Next year Climax will complete the work to enhance the strength of existing <br />slabs within the crusher in preparation for placing the final soil cover over the foundation. <br />Please call if you have auy questions or are in need of any further information. I can be <br />reached at (303) 569-3221 ext. 2214. <br />Very truly yours, <br />,_~ /.. <br />Erich Bower <br />Environmental Engineer <br />Enclosures (2) <br />Cc: Mike Ley -Climax (letter only) <br />Anne Beierle -Climax (letter only) <br />Dave Brence -Climax (letter only) <br />Rich Wagner -Climax (letter only) <br />