(3) <br />• done during this quarter primarily due to its wet condition from the wet winter <br />and spring. Placement of this material is scheduled for September and October <br />of this year. <br />The work remaining is the cover, completion of the rock toe, seeding and <br />the installation of the 4 stability monuments at the top of the bench. All of this <br />work is scheduled for this fall. <br />The work done this quarter was done in a proper workmanship manner and <br />in compliance with the approved design, as specified in the Mine Bench <br />Stabilization technical revision submitted to Colorado Mined Land Reclamation <br />August 9, 1984, and its Appendix 1B submitted September 6, 1984. Based upon <br />the information stated herein, regular field inspections, and professional <br />• consultation, I hereby certify that the work done this quarter on the Blue <br />Ribbon Bench Stabilization project has been done in accordance with the plan <br />approved by Colorado Mined Land Reclamation. <br />Larry ~(~I. Reschke, PE 19691 <br />1oEY'I <br />n <br />U <br />