Laserfiche WebLink
• i <br />ANNUAL REPORT <br />r-' INSTRUCTIONS <br />< <. <br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-33.E-I 16(3)(a), on the anniversar}~ date of the permit each year. <br />[he operator shall :submit a repots and a map showing the extent of current disturbances to affectec land, <br />reclamation accomplished to date and during [he preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performzd during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the abovz zlemznts may suffice For a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Repots the following information as required by Z CCR 40"1-I, 407-4, and Rules <br />1.13.7(1)(x): <br />(i) [he condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if they are pan of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Waranty, specificall}~: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1;~(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.150si(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit ari update, by a qualified <br />independent appraiser, indicating any changes in properly value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of TIUS[, or Security agreement, <br />and the value of the property subject to either of these instruments. The repot stall also provide <br />"- - - ' - proof that there are no past-due properly taxes.- - - - -- <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secuted with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in [he fore <br />of a balance sheet, certified by a Certified Public Accountant, demcns[ratino that [he Litter of <br />Credit does not exceed ten percent (1090) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, [he operator shall pro~~idz a repot is sufficient <br />detail to fully describe the condition, value, and location of all pled;ed fixtures a.id equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will no[ have ai Environmertal Protection <br />Plan as pan of your approved permit.) <br /> <br />