My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04738
DRMS
>
Back File Migration
>
Report
>
REP04738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:35:54 PM
Creation date
11/26/2007 10:53:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Report
Doc Date
10/19/1989
Doc Name
BOND RELEASE SUBMITTAL CERTIFICATIONS BOURG MINE C-81-021
From
MLRD
To
WALDEN COAL CO
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III IIIIIIIIIIIIIIII c~ <br />~TATF. OF COLUI~U <br />'~\',~^~• Roy Romer, Governor ,~ <br />~•.:^., j <br />~B16 • ~ <br />I... _~ <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION j; ;~~. <br />.~~' <br />FRED R. BANTA, Director ` <br />~~9 <br /> ~1 ~ <br />October 19, 1989 <br />Mr. Scott Patten <br />Walden Coal Company <br />P.O. Box 229 <br />Boulder, CO 80306 <br />Re: Bond Release Submittal, Certifications, Bourg Mine, C-81-021 <br />Dear Mr. Patten: <br />I would like to take this opportunity to respond to the two issues raised in <br />your September 11, 1989 correspondence regarding certification. You suggest <br />that there is no regulatory basis for our request for the submittal of <br />certified as-builts and that the Division retroactively is imposing these <br />requirements on Walden Coal. The Division differs with you on both counts. <br />Rule 4.05.6(7) requires that sediment ponds be certified. Walden Coal Co., <br />however, received a variance from use of sediment ponds and instead installed <br />a "treatment facility" composed of terrace ditches in accordance wiU1 Rule <br />4.05.2. It is therefore reasonable to require that the treatment facility <br />installed in lieu of sediment ponds be certifed as well. Therefore during <br />the permit revision process the Division requested, on page 2, item 5 of our <br />May 18, 1988 letter, that Walden Coal Company provide certified as-builts <br />of the sediment control installation. Walden Coal Company acknowledged <br />this request with a commitment to submit "as-constructed terrace surveys" on <br />page I-4(a) of the permit application. We therefore anticipated that this <br />commitment would be met. <br />Lastly, prior to initiation of the bond release process, the Division <br />transmitted a copy of the Handbook Memorandum on Bond Release on Permanent <br />Program areas (dated August 22, 1986) to Walden Coal Company. This document <br />itemized the components of the bond release package which includes as-built <br />post-mining topographic maps, certified cross-sections, and documentation <br />that the drainage system is functioning as approved. <br />Please call if you have any questions. <br />Sincerely, <br />J ~ <br />` /, <br />Catherine W. Begej <br />Reclamation Specialist <br />CWB/ern <br />0257E <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 60203-2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.