Laserfiche WebLink
_ SLOPE STABILITY <br />INTERIM INSPECTION REPORT <br />AREA Wadge Highwall Drainage Fill DATE ~~g~ <br />TIME 10:00 AM WEATHER Cloudy 40° F <br />1. Debris, organic matter, coal, etc., present in fill None Visible <br />2. General gradation and characteristics of material No ADDarent chanoe from <br />the November 27, 1990 inspection. <br />3. Presence of water, surface and ground The ground was Covered with <br />snow. No visible water movement or oonding. <br />4, Condition of underdrain (approx. current width, depth, and length), m aterial <br />gradation and characteristic, compaction, presence. of water <br />Not Aoolicable <br />5. General material movement None visible <br />6. Proximity and treatment of seep points Nnt. ANnlirahla <br />7. Condition of slope fill surface (grading, cracks or sloughing, erosion, <br />revegetation) No visihle rhangP_ Snnw rnvarad_ <br />8. Recommendation Continued observation as the fill is placed and the <br />West Wadge Pit is graded and reclaimed. Differential settlement and <br />erosion should be monitored and repaired as necessary. _ <br />9. Accountability <br />I certify the preceding observations and comments to be true and accurate to <br />the best of my knowledge. <br />~~ .T March 8, 1991 <br />„tRonal I, y Gehi c6~ Oate <br />~Colora~ .E. 18syRJ <br />