Laserfiche WebLink
<br />Bowie Resources Ltd. <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspectlon Report <br />2nd Quarter of 1996 <br />Item <br />YesMo <br /> <br />Commerce <br />1 Ouentit)r of waste meWial added m waste deposal Yea Appronmately 310 aYyde. o! gob was added to the <br /> area during reparlirp period. waste disposal pile durtrp reporting period. <br />2 Waste material deposited end wrnpaded'n Yes Waste material was daposAed and compacted <br /> 24 inch Glts~ durip this quarter in 1, 24 irnh tilt <br />3 Drainage aHaration wretrucied9 No No dra'rags alWatiors wore conctrtrctsd dudrp Hr <br /> quarter. The adstirq drainage paltem was mairdaiad <br /> round the perimeter d the pile fD protect outstopes <br /> and diced drainage d the toe of Ha pile. <br />4 Present height of woofs material? Highest hoipld eppro>amatey 99.0 feet <br />5 New berwh corstnrded9 No <br />8 Refuse material aulsbpec placed at 1 V:2V outslopes9 Yes Sbpes were checked for proper placement <br /> periodneiy during corstruction. <br />7 Adequate drainage on mP o(conpleted fiY9 Yes Grading was maintained an bop of compbtsd N 6k <br /> m er>sure pmper drainage hom top of pis. <br />e Beach drainage adequate? Yes Berrh drainage was maintained HroughaR the <br /> quarter. See item 3. <br />9 Outsbpes covered wih 4 foot norrtoric, Yes OuL4opes have been covered with epprorimetety <br /> non-combustibb material9 4 feet of non-to~dc, non,combustihle material drrirp <br /> His quarter. <br />10 Berms corstruded an aulsbpes7 Yes <br />11 Evidence of structiral defects No <br />12 Topsoil adequately cahaged and stored9 NA No edditioral topsoi wac selvaged hom His pis His <br />quarter. <br />13 Trash removed? Yes Trash was removed prior to compaction. Ora new <br /> lifer added Htis quarter. <br />14 Additional commemel' No <br />I certify Ha above report as being acara~e to the best of knowledge. <br />iiii. /~ ~N~i~ <br />Signabre <br />~ ~~-yG <br />Date <br />ORTGOB.XLS <br />