My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04584
DRMS
>
Back File Migration
>
Report
>
REP04584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:35:46 PM
Creation date
11/26/2007 10:50:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
1/18/2002
Doc Name
MEMO REVIEW FOR COMPLIANCE FN C-81-019 COLOWYO COAL MINE WEST PIT FILL INSPECTION REPORT 4TH QTR
From
DMG
To
FILE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FAX: 1303)832-8106 <br />interoffice <br />MEMORANDUM <br />to: File C-81-O19 Colowyo Coal Mine, <br />2001 <br />from: Byron G. Walker <br />subject: Review for Compliance <br />date: January 18, 2002 <br />Rule 4.09.1(11) hrspection <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•BAFETY <br />B,II Owens <br />Governor <br />Greg E. Watcher <br />Wes[ Pi[ Fill Inspection Report, 4'h Quart~teCncve Director <br />Michael B. Long <br />Division Direuor <br />Rule 4.09. I (1 1)(a) The fill shall he napected for stabi(iry by a registered engineer or other <br />yrralified professional specielist experienced in construction of earth and rockfrll enrbnrrknrents <br />under the direction of u qua/ified professional engineer cu least qunrterlyl throughout the <br />construction and dururg the following critical construction periods'": (1)removal of all organic <br />material and topsoil, (2)placement of underdrninnge systems, (3) installation of surface drainage <br />systems, (4) plncemeru and compaction of fill nruterials, and (5) revegetution. <br />The permittee is in compliance with this rule. I This is a quarterly report. A registered engineer <br />accomplished both the inspection and certification.'' None of the critical construction periods <br />were encountered during the time period of the report. <br />Rule 4.09.10 l)(b) The qua/ified registered errgirreer shcd/ provide to the Division a certified <br />report within 2 weeks offer each inspection 1 t/rat the fit/ has been constructed as specified in the <br />design approved by the Division. '`The report shut! inchrde a description of any appearances of <br />instability, strucnu-nl weakness, and other hazardous conditions observed during the ir:.rpection. <br />A copy of the report slral[ be retained nt the mare site. <br />The action is in compliance with this nlle. The inspection was accomplished on December 31, <br />2001. The report was prepared on January 3, 2002. The inspection report was submitted to the <br />Division under a letter of January 3, 20021, and received at the Division of January 14, 2002.' <br />The report included observations on instability, structural weakness and other (lack of) hazards. <br />files: C-SI-019 West Pit Fill Reports <br />C:\WPDOCS\Colowyo\wesl pit spoil fill report 4Q1 review.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.