Laserfiche WebLink
<br />Notice of Intent to Continue Mining Operations <br />110(2) Annual Report <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br />High Plains Stone Company <br />M-90-016 <br />South 40 Quarry'" <br />07/11/94 <br />RECE~vFD <br />JUN 2 1994 <br />Dir;~!cn c; i:'ineid~s h ~ec;c~n~. <br />°;225.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO ~" <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />2a. Financial Warranty: $~ D00 2b. Permitted acreage: <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* ~~t~ <br />5. Total acres reclaimed for the report year:* ~.g <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: ~ d. Topsoil replaced: ~_ <br />b. Graded: O Average topsoil thickness <br />c. Seeded: ~_ replaced: O <br />List species seeded & seeding <br />rate for report year on back <br />7 <br />8 <br />9 <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* (~ <br />Estimated total acres to be affected in the next report year:* gGres ~ ~~ <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: Date: S faS~]¢ <br />Please typ print curre contact name, mailing address, and phone number below: <br />i <br />i q <br />Contact Name: Phone: (~~ > ~7 / g9 I <br />Company: <br />Address: <br />Federal Tax ID No. or Social Security No.: ~ ~ ~~~~ ~q <br />~~q~ <br />