My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04316
DRMS
>
Back File Migration
>
Report
>
REP04316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:35:28 PM
Creation date
11/26/2007 10:45:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Report
Doc Date
2/16/2006
Doc Name
4th Quarter 2005 Subsidence Report Review Memo
From
DMG
To
File
Permit Index Doc Type
Subsidence Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Checklist for Subsidence Monitoring Report <br />Mine: King Coal Date this review was completed: 2/16/05 <br />Permit No.: C-81-035 CDMG reviewer: Tom Kaldenbach <br />Report period: 4`h quarter 2005 <br />Monitoring requirement Regulation citation In complian' e: <br />Yes / no . Comment <br />Installed and surveyed Only the Crawford residence <br />monuments prior to 2.05.6(6)(c)(i)(A) Yes required monuments. Those <br />undermining. monuments were surveyed <br /> quarterly from Oct. 2001 until <br />Located monuments to Apri12003 when DMG approved <br />detect vertical 2,05.6(6)(c)(i)(B) Yes suspension of monitoring. The <br />subsidence and monuments aze to remain in place <br />horizontal displacement. for possible future use (permit <br /> Section 2.05.6, age 4). <br /> Quarterly monitoring is required <br />Monitored each for only: surface cracks over <br />structure's orientation, 2.05.6(6)(c)(i)(C) Yes abandoned workings, the <br />location, elevation. Huntington ditch, and the <br /> Crawford ditch. <br />Monitored each <br />monument and structure 2.05.6(6)(c)(i)(D) Yes <br />at least uarterly. <br />Commenced monitoring <br />of each monument and <br />structure at least one 2.05.6(6)(c)(i)(D) Yes <br />month prior to <br />undermining. <br />Submitted monitoring <br />report at least 2.05.6(6)(c)(i)(E) Yes <br />semiannually. <br />Conducted sufficient <br />post-mining monitoring 2,05.6(6(c)(i))(F) Yes <br />to verify subsidence <br />prediction <br />Accurately predicted 2,05.6(6)(d)(i) Yes In compliance based on <br />subsidence. observations below. <br />There was no imminent <br />or actual material <br />damage or diminution of 2.05.6(6)(d)(i) Yes In compliance based on <br />use of renewable observations below. <br />resource lands or <br />structures <br />
The URL can be used to link to this page
Your browser does not support the video tag.