r ANNUAL REPORT ~ ~ !~
<br />INSTRUCTIONS -
<br />According to C.R.S. 34-32-I 16(3). and C.R.S. 34-325-I 16(3)(x). on the anniversary date of the permit each year,
<br />the operator shall submit a report and .t map showing the extent of current disturbances to affected land.
<br />reclamation accomplished to date and durine the preceding year, new disturbances that are antictpa[ed [o occur
<br />during the upcoming year, and redam uion that will be performed durine the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules
<br />1.13.7(I)(a):
<br />(i) the condition of the operation at the time of cessation;
<br />(ii) what specific measures have been and wtll be implemented to comply with reclamation, performance
<br />standards and Environmental Protecti~m Plan requirements, if they are part of your approved application; and
<br />(iii) plans for resumption of ntining operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of :: CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement
<br />regarding [he sufficiency of t}te value of the Financial Warranty, specifically:
<br />(i) Per the requirem~:nts of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated
<br />sta[etr(ent regarding tae sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirem~:nts of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances w'iich may affect the adequacy of the Deed of Trust, or Security agreement,
<br />and the value of the property subject to either of these instruments. The report-shall also provide -
<br />_ _- _ - - - - _ --proof-than there are no~ast-due propenyiares.
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the fot~n
<br />of a balance sheet, ctirtified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any Fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe [he condition, value, and location of all pledged fixtures and equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information
<br />required as pan of the appro~~ed permit application, to include the Environmental Protection Plan. (Please
<br />note that iF you are not a Designated Mining Operation, you will not have an Environmental Protection
<br />Plan as part of your approved permit.)
<br />
|