Laserfiche WebLink
{ <br /> <br />(2) Spring water monitoring stations: <br />(a) SP-1; Long Draw Spring <br />(b) SP-2; Section 33 Spring <br />(c) SP-3; Homestead Spring <br />(d) SP-4; Bramiers Draw Spring <br />(e) SP-5; East Homestead Spring <br />(f) SP-6; H & W Spring No. 1 <br />(3) Alluvial well monitoring stations: <br />(a) AW-3; Alluvial Well, Section 33 <br />(b) AW-4; Alluvial Well, Bramiers Draw <br />(c) AW-5; Alluvial Well, Bramiers Draw <br />(d) AW-6; Alluvial Well, Naturita Creek <br />(e) AW-7; Alluvial Well, Naturita Creek <br />(4) Bedrock well monitoring stations: <br />(a) BW-1; Bedrock Well, Section 3 <br />(b) BW-2; Bedrock Well, Section 33 <br />(c) BW-3; Bedrock Well, Section 11. <br />B. The following is a description of the water monitoring <br />frequency / water quality analysis program as described in the <br />Hamilton mine permit. <br />(1) Water Monitoring Requirements (post TR-06) <br /> Monitoring Station Monitoring Schedule <br />B-1 Upper Bramiers Draw 1 & 5 <br />B-2 Lower Bramiers Draw 1 & 5 <br />N-lA Upper Naturita Creek 2 & 4 <br />N-2 Lower Naturita Creek 2 & 4 <br />2 <br />