Laserfiche WebLink
<br /> <br />use the 3rd and 4th quarters of 1991 and the 1st and <br />2nd quarters of 1992. <br />During the 4th quarter of 1991 and the 1st quarter <br />of 1992 the ditch was reported as dry. The full <br />suite list was taken only for the 2nd quarter of <br />1992. Field parameters were taken for both the 3rd <br />quarter of 1991 and the 2nd quarter of 1992. <br />The 4th quarter of 1995 a new monitoring plan went <br />into effect, under TR-06. This eliminated the need <br />for monitoring of station R-1 during the 4th quarter <br />of 1995. For purposes of comparison with baseline <br />water quality data from 1991 and 1992, the 4th <br />quarter of 1994 will be included along with the 1st, <br />2nd, and 3rd quarters of 1995. <br />All quarters of 1995 and the 4th quarter of 1994 <br />were reported as dry. <br />water Quality Data: <br />Baseline Data 1995 Data <br /> Max Min Max Min <br />Flow (cfs) 2.3 2 DRY DRY <br />Flow (gpm) 1032 898 <br />pH 8.4 8.4 <br />Conductivity 425 335 <br />T. D. S. 260 <br />T. S. S. 5 <br />S. A. R. .20 <br />D. O. 8.0 <br />HC03 124 <br />C03 0 <br />Ca 56 <br />C1 9 <br />Mg 5 <br />Ammonia .00 <br />Nitrate .151 <br />Nitrite .00 <br />28 <br />