Laserfiche WebLink
(b) Monitoring of station BW-2 started in the 4th <br />quarter of 1990 on 12/6. The data from 1990 will be <br />used along with data from 1991 as the baseline water <br />quality data since the monitoring did not taken <br />place prior to 1990. <br />In the fourth quarter of 1990 there was a recorded <br />depth of 118 feet, but not enough water to obtain a <br />sample. For the rest of 1991 the well was reported <br />as dry. <br />From 3/13/91 to 10/1/95 the well was reported as <br />dry. There was no field parameters or full suite <br />list one's taken for the whole of the monitoring. <br />(14) BW-3 Bedrock Well, Section 11 <br />Bedrock Well Monitoring Station <br />(a) Monitoring Schedule (post TR-06): <br />(i) Depth to water semi-annually. <br />(b) Monitoring of station BW-3 began in the 4th quarter <br />of 1990 on 12/6. The baseline water quality data <br />will include the 4th quarter of 1990 to the third <br />quarter of 1991. <br />A full suite list and field parameters were taken on <br />12/6/90 and is the only full suite list and field <br />parameters taken for the BW-3 monitoring station. <br />Field parameters were also taken in the fourth <br />quarter of 1990. <br />The well was reported as dry from 6/30/92 to <br />10/1/95. <br />Water Quality Data: <br />Baseline Data 1995 Data <br /> Max Min Max Min <br />Depth to <br />Water (feet) 120 DRY DRY DRY <br />pH 7.5 <br />22 <br />