Laserfiche WebLink
water quality data taken before mining began, <br />the 1991 data will serve as the baseline. <br />B-1 was monitored 11 times in 1991 for possible <br />flow, no flow was recorded for all of 1991, and <br />along with that there was no field parameters or <br />data taken for suite list 2. <br />B-1 was monitored 11 times in 1995 for possible <br />flow, no flow was recorded for all of 1995, and <br />along with that there was no field parameters or <br />data taken for suite list 2. <br />(2) N-1/N-lA Upper Naturita Creek <br />Surface Water Monitoring Station <br />(aj Monitoring Schedule (post TR-06): <br />(i) Field parameters semi-annually. <br />(ii) Annual fall full suite list 2. <br />(b) Monitoring station N-lA replaced monitoring station <br />N-1 effective in 1993. The baseline water quality <br />data for N-1 will be used for comparison with N-lA <br />data for 1995 since data for N-lA was not recorded <br />before the 3rd quarter of 1991. N-1 and N-lA are <br />located approximately 3/4 of a mile apart. <br />In the 4th quarter of 1995 a revised monitoring <br />schedule went into effect, under TR-06. This <br />eliminated the need for the monitoring of station N- <br />lA during the 4th quarter of 1995. For purposes of <br />comparison with baseline water quality data from <br />1988, the 4th quarter of 1994 will be included along <br />with the 1st, 2nd, and 3rd quarters of 1995. The <br />plan listed above is the revised TR-06 monitoring <br />schedule. <br />The field parameters taken are being included in the <br />maximum / minimum table listed below. There was no <br />temperature taken for station N-1 for all of <br />monitoring. <br />Water Quality Data: <br />Baseline 1995 <br />Max Min Max Min <br />7 <br />