My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04258
DRMS
>
Back File Migration
>
Report
>
REP04258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:35:24 PM
Creation date
11/26/2007 10:44:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
12/11/2001
Doc Name
1993 AHR text & streamflow
Annual Report Year
1993
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />Pond FW-1 provides for water storage. <br />Water can also be stored in Sediment Ponds <br />MB-l, MB-2, and MB-3 under a separate <br />decree. Storage is usually limited to the <br />maximum sediment level elevation. Trans- <br />fer to FW-1 is possible as outlined in the M <br />& R Plan. Average withdrawals are not <br />expected to exceed 400,000 gallons per day <br />Activities <br />(gpd). Flow may fluctuate depending on <br />requirements associated with varying pro- <br />duction levels. During 1993, the average <br />withdrawal was 159,276 gpd for 250 work- <br />ing days. This increase in usage can be <br />attributed to more consistent operation of the <br />longwall and the resultant increase in pro- <br />duction. <br />Table 4 Summary of the Groundwater Monitoring Program at the West Elk Mine <br />Well Water Level Field Water Quality Lab Water Quality <br />Facility Area Wells and Alluvial Wells <br />$G-1 3 times per year 3 times ptr year 3 times per year <br />GP-I 3 times per year 3 limes pcr year' 3 limes per year' <br />GP-3 3 times per year 7 times per year' 7 times per year' <br />GP-4 3 times per year 3 times per year' 3 limes per year' <br />GP-5 3 times pcr year 3 times per year' 3 times per year' <br />Facility Arca Well completed in the Rollins Sandstonejust below the 'B" Seam <br />SOM-I28-H 3 times per year 7 times per year 7 times per year <br />Permit Area Well completed in the'E" Seam <br />• <br />SOM-27-H2 3 dmes per year' 3 times per year' 3 times per year' <br />Permit Area Wells completed in the Borten Member above the "F" Seam <br />B-33 7 times per year 3 times per year 3 limes per year <br />SOM-80-H 3 times per year 3 dmes per year 3 timcs per ycar <br />SOM-13-H 3 times per year 3 times per year 3 dmes per year <br />SOM-38-H-I Lost before the third season <br />measurements <br />SOM-38-H-2 Lost prior to WY 1993 <br />SW-1 3 rimes per year 3 times per year 3 times per year <br />SW-2 3 times per year 3 times per year 3 times per year <br />SW-3 3 times per year 3 times per year 3 times per year <br />SW~ 3 times per year 3 times per year 3 times per year <br />SW-5 3 times per year 3 dmes pet year 3 times per year <br />SW-6 3 times per year 3 times per year 3 limes per year <br />Study Area Wells completed in the'F" Seam <br />SOM-2 3 dmes per year 3 times per year 3 times per year <br />SOM-16-H 3 times per year 3 times per year 3 times per ycar <br />SOM-3B-H3 Lost prior to WY 1993 <br />Ptmdt Area Wells completed N Ne "B" Seam <br />C-72-H 3 times per year 3 times per year 3 times per year <br />SOM-127-H 3 times per year 3 times per year 3 times per ytar <br />1MB-l2' 3 times per year 3 times per year 3 times per year <br />SOM-I29-H 3 times per ycar 3 times per year 3 times per year <br />' Required plan, but partially or no[ accomplished Jue to no ur insufficient water for sampling. <br />• 'Jumbo Mountain expansion addition. measurements started with the third season measurements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.