Laserfiche WebLink
(l. ~ ~ ' ANNUAL REPORT c ~ <br />". INSTRUCTIONS - <br />Accordin, to C.R.S. 34-3"_'-I 16(3), and C.R.S. 34-33S-I 16(3)ta), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to alfected land. <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation tha[ will be performed durine [he upcornin~ year. Please mach such <br />a repott and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR =t07-1, d07-4, and Rules <br />1.13.7(1)(x): <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if they are pan of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, az applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules ].15(1)(x), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable le[tets of credit, Deeds of Trust, and securi[y agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in properly value, and a statement summarizing <br />any circumstances which may affect the adequacy of [he Deed of Trust, or Security agreement, <br />_ __ _ _ _ and the value of the property s~zc[ to either of these instruments. The repon.shall alsapro.vide- - - <br />proof that there are no past-due properly taxes. <br />(i) Per [he requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to Fully describe [he condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(c), all monitoring information <br />required as part of the approved permit application, [o include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will no[ have an Environmental Protection <br />Plan as part of your approved permit.) <br />