Laserfiche WebLink
1 <br />1 <br />'- <br />1 <br />1 <br />ConeTec Inc. <br />SPT Energy Calibration Data Reduction <br />May 3, 1995 <br />Battle Mountain Resoun:es -San Luis Mine <br />CME 75 with 140 Ib Auto Hammer <br />Adana Systems Energy Calibrator <br /> Blow counts <br />Depth (ft) for 8 inches <br />42 3 3 7 8 <br />44 4 7 7 10 <br />48 3 8 7 8 <br />52 3 7 11 14 <br />Boring 2 <br />Blow Count % Energy N-80 <br />N <br />15 29.9 7 <br />17 31.1 9 <br />15 48.1 12 <br />25 45.5 19 <br />