Laserfiche WebLink
• <br />ANNUAL REPORT <br />INSTRUCTIONS <br />»-~ ~ ~~ <br />Y <br />1 ( ' <br />~ ~, ,' .. r' .~ -... <br />ar:i iii11 ~I ; y u d <br />According [n C.R.S. 34-32-116(3), and C.R.S. 34-32.E-1 I6(3)(a), on the anniversary date of the permit each year. <br />the operator shall submit a repon and a map showing the extent of current dismrbances [o affected land, <br />reclamation accomplished to date and during the preceding year, new disturbances that are an[icipated [o occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map tha[ clearly delineates and includes <br />the above el~:ments may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1.407-4, and Rules <br />1.13.7(I)(a): <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented [o comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-I, 407-4, and Rules I.IS(1), provide an upda[ed statement <br />regtding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.1 ~(1)(a), provide an upda[ed <br />statemen[ regarding the stfficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixmres. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of the property-subject to either of these instruments. The report sha!! also provide <br />proof that there are no past-due property taxes. <br />(i) Per the requirements of 2 CCR 407-], 407-4, and Rules 4.7(3), permits secured with an <br />h-revocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed [en percent (10%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.4.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requiremeNS of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as pan of the approved permit application, to include the Environmental Protection Plan. (Please <br />not.. that if you are not a Designated Mining Operation, you will not have an Environmental Protection. <br />Plan as part of your approved permit.) <br />