Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 1 Inspection - 2"d Quarter 2005 <br />On June 18, 2005, I performed the required quarterly visual inspection of the Cameo <br />Refuse Disposal Area No. 1 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. <br />The south under drain was dry. The entire pile was dry. No seepage was noted around <br />the pile. The upper diversion ditch and collection ditches were inspected with no <br />problems noted. The rocks located in the collection ditches noted in the first quarter <br />2005 report had been removed. <br />The access road to the pile, which is the west extension of Haul Road No. 5, remains <br />open to accept coal and refuse material from other reclamation activities. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human fife. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 1 refuse pile have been constructed as permitted in the design approved by <br />the DMG. <br />Recommended maintenance: None <br />James ~ S,fow,er ~~ ~~~~~ ~. . _ ~ Date <br />P.E. No. 19~0~ ,;a`~°~•' <br />®s~ur~a':L ~~`Gv <br />®o„.. n O <br />