Laserfiche WebLink
~ii i i ii i ii i ii iiii iii <br />999 <br />ENERGY FUELS COAL, INC. <br />SOUTIITIELD MINE <br />P.O. BOX 449 <br />FLORENCE, COLORADO 81226 <br />QUARTERLY INSPECTION REPORT <br />COAL PROCESSING WASTE BANKS <br />Waste Bank Identification: Primazy Refuse Disposal Area <br />Date of Inspection: August 29, 1996 <br />Waste Bank Location: Sec. 30, T20S, R69W, 6th P.M. <br />Fremont Counry, Colorado <br />Comments: The coal processing waste bank was visually inspected and found to be in general <br />compliance with the CMLRD approved Reconstruction Plan for the Coal Processing Waste Bank. <br />The planted areas of the waste bank exhibit good plant growth. Minor erosion rills were noted on <br />the topsoiled and seeded area on the south side neaz the advancing face. <br />Soils Testing Results: Soils testing by others on 01/13/96 yielded the following values. <br />MoistumDensily Relation fASTM D 6981 <br />Soil Sample Plasticity Index <br />Type <br />Coal washery fines (-3/4") Nou-plastic <br />Coarse refuse (-3/4") Non-plastic <br />Compaction Testing -Coal refuse pile. In-place Densities <br />Depth <br />Top <br />Bottom <br />Compaction Range <br />70.5%-96.5% <br />74.8 % - 91.3 <br />Moisture Content <br />(Optimum) <br />33.7 % <br />20.5 % <br />Moisture Content <br />10.9% - 12.9% <br />53.2%-60.4% <br />Recommendations: Repair erosion rills within the next quarter. <br />Inspected by: David 1. Brent, P.E. <br />Colorado Registration No. 13290 <br />