Laserfiche WebLink
<br />1.4 DUST AND SEDIII4ENT CONTROL <br /> A. Provide for control of dust emission during excavation and hauling so as to comply with <br /> the requirements of the RESIDENT PROJECT REPRESENTATIVE and applicable <br /> Colorado state regulations. Subcontractor will provide watering of haul roads or utilize <br />' dust suppressants or any other measures approved by RESIDENT PROJECT <br /> REPRESENTATIVE as required during all construction operations at all work areas. <br /> Subcontractor shall furnish water as necessary to complete those tasks. <br /> <br /> B. Control sediment from excavated areas to prevent sediment loading to waterways or <br /> adjacent property. <br />' <br /> 1.5 SUBMITTALS <br /> A. Catalog cut sheets, product certification and/or samples as directed by RESIDENT <br /> PROJECT REPRESENTATIVE. <br /> B. Shop drawings as required. <br />' 1.6 RELATED SECTIONS <br /> A. 02800 -Wire Fence and Gates <br /> <br /> PART2 PRODUCTS <br /> 2.1 GRNRRAT. <br />' A. The Subcontractor shall provide all materials and equipment in suitable and adequate <br />quantity as required to accomplish the work shown, specified herein, and as required <br /> to complete the project. <br /> 2.2 BACIO~IILL MATERIAL <br />A. Backfill materials shall be rock particles which aze durable, impermeable, and insoluble <br />in water. Material shall not be subjected to any process which may alter the <br />mechanical or chemical properties. <br />2.3 CEMENT <br />' A. Cement shall be Type II Portland cement, conforming to ASTM C 150. <br />2.4 CEMENT-GROUT <br />' A. Cement-grout shall consist of commerci v 'able sand and cement mix with a <br />minimum rated compressive strength f ,5 psi at 28 days. <br />~ypG~ <br />6-6 <br />