Laserfiche WebLink
<br />SECTION 5 <br />STATIII3IIVT OF WORK <br />' In accordance with the terms and conditions of this CONTRACT, the SUBCONTRACTOR is <br />to pmvide all labor, materials, supplies, tools, equipment, and supervision as required by the <br />CONTRACT. The major scope of work items are as follows: <br />1 1. Mobilization of all necessary materials, laborers and equipment to subject site as required <br />' to satisfactorily complete the SCOPE OF WORK. <br />2. Closure of six (6) adits herein referred to as Sites A, B, C, D, E, and F in accordance with <br />' this CONTRACT and TECHNICAL SPECIFICATIONS and with any applicable State of <br />Colorado Department of Natural Resources, Division of Minerals and Geology regulations <br />governing mine closures. <br />3. Finish grading of the general area surrounding subject mine adits and of any area impacted <br />by SUBCONTRACTOR, including the demolition and disposal of existing materials and <br />foundations and relocation of any stored or relocated materials,. <br />4. Replace fence at Site G. <br />5. Remove rock in retaining fence at Site H. Repair and/or replace as necessary and reinstall. <br />6. Other work requested by RESIDENT PROJECT REPRESENTATIVE for which <br />SUBCONTRACTOR is qualified. This work will be reimbursed for actual labor and <br />equipment hours and materials provided per the unit rates for extra work presented in <br />Section 2. <br />7. Demobilization from site. <br /> <br /> <br />LJ <br />1 <br />5-1 <br />