My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03942
DRMS
>
Back File Migration
>
Report
>
REP03942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:53 PM
Creation date
11/26/2007 10:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Report
Doc Date
8/14/1995
From
DAMES & MOORE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 5 <br />STATIII3IIVT OF WORK <br />' In accordance with the terms and conditions of this CONTRACT, the SUBCONTRACTOR is <br />to pmvide all labor, materials, supplies, tools, equipment, and supervision as required by the <br />CONTRACT. The major scope of work items are as follows: <br />1 1. Mobilization of all necessary materials, laborers and equipment to subject site as required <br />' to satisfactorily complete the SCOPE OF WORK. <br />2. Closure of six (6) adits herein referred to as Sites A, B, C, D, E, and F in accordance with <br />' this CONTRACT and TECHNICAL SPECIFICATIONS and with any applicable State of <br />Colorado Department of Natural Resources, Division of Minerals and Geology regulations <br />governing mine closures. <br />3. Finish grading of the general area surrounding subject mine adits and of any area impacted <br />by SUBCONTRACTOR, including the demolition and disposal of existing materials and <br />foundations and relocation of any stored or relocated materials,. <br />4. Replace fence at Site G. <br />5. Remove rock in retaining fence at Site H. Repair and/or replace as necessary and reinstall. <br />6. Other work requested by RESIDENT PROJECT REPRESENTATIVE for which <br />SUBCONTRACTOR is qualified. This work will be reimbursed for actual labor and <br />equipment hours and materials provided per the unit rates for extra work presented in <br />Section 2. <br />7. Demobilization from site. <br /> <br /> <br />LJ <br />1 <br />5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.