My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03941
DRMS
>
Back File Migration
>
Report
>
REP03941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:53 PM
Creation date
11/26/2007 10:40:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994114
IBM Index Class Name
Report
Doc Date
11/18/1997
Doc Name
ADMINISTRATIVE RECORD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIII. FINISHED PRODUCT <br />A. LOADING INTO FINISHED PRODUCT STOCKPILE <br />14ethod of loafing in (front-end loader, conveyor, etc.) <br />fYJn~ S' ~~___! <br />Zf conveyor is used, what is maximum drop height? ft. <br />Loading sc}ied•~le: tons/hour hours/d a}' days/}'e_r <br />Proposed controls <br />Controls for loading to stoc~pile include other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />B. FIt+I SHED PRODUCT STOCKPILE <br />1iar:imum tens stored at one time +40,000 tons. <br />Length o. t.i~ e pile re-,a ins undisturbed =s nz~..etl <br />Proposal controls: (chec< appropriate boxes) <br />0 <br /> <br /> <br />~~aterinc ~-~ tic,es/day, or _ <br />maintain ~-~oist surfac=_) . <br />Chenical stabilizer (applied <br />specifica~ions). <br />Compacting of piles, r,•ethod <br />Enclosures: complete, or <br />continuous sprin):ler (to <br />according to manufacturer's <br />partial (chec;: one) <br />P.evegetation, (length of time till revegetation <br />other (specify) <br />(~O COntr01 <br />C. LOADIt7G OUT FR04 STOCKPILE FOR FINAL TRA1iSPORT <br />ttethod of loading out (front-end loader, conveyor, etc.) <br />If conveyor is used, <br />Loading schedule: _ <br />Proposed controls _ <br />Controls for loading out of stockpile include Mater injection, <br />chemical dust suppressants, bag collectors, other (specify), no control <br />water sprays, total enclosure, partial enclosure, Chenical suppresants, <br />reduced drop height, telescoping chute. <br />~'~154 <br />what is maximum drop height? ft. <br />_ tons/hour hours/day days/year <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.