Laserfiche WebLink
I. TOPSOIL <br />A. P,E:?OVAL <br />t;axinu-: ton=_ re-owed oer da'.' i,0~0 Der 10 ec. tree <br />Tons r=_~oved oe_ vear er 10 ac. watt <br />Proposed controls for topsoil removal: (check appropriate boles) <br />v <br />i:oist :;aterial <br />^ ~+a ter Spray <br />^ Other (specify) <br />^ .ic Control <br /> c. T-0PSOIL STOCS?.L-~ <br />Aia>:i r.,~c. stored ac one ti-.=_ 1='?:000 tons. <br />t;ar.i r~un stored c=_r year i_'7,000 tens. <br /> <br />Leng <br />th of tit=_ pile renains undisturbed + 5 tars <br />_ Y <br />Prop osed controls for topsoil stockpile: (check appropriate bor.) <br />^ liaterine tip-,es/day, or continuous sprin};ler (to <br /> r.~aintain r.,oi st surface) . <br />^ Chenical stabilizer {idp=_: ), <br />^ Compacting of piles, ~-~=_thod <br />^ enclosures: co~olete, or partial (check one) <br /> p=_vegetation, (Le r,3th o tine till revegetation '-5~'.Dnt%~s ). <br />^ Other (specify) <br />^ t:o control <br />II. OVERBURDE27 <br /> A. P,nHOVAL <br />Pfar.i.^.,un tons removed per de_: 3,000 Der 10 ac. tract <br />ions removed per year c.,S'~' ,.r 10 ac..tract <br />Equip-ent used for remo•:•zl~-raD2r, Loader. Coz=r <br />Propc=_ed controls for o•:erburden renoval: (check appropriate boxes) <br />foist 1•Saterial <br />^ . F;ater Spray <br />^ Other (specify) <br />^ ;io Control <br />00049 <br />2 <br />