Laserfiche WebLink
E%AIHIT L <br />RECLAMATION COSTS <br />Following are estimated reclamation costs for the area per 10 acre mining tract. <br />Top soil and overburden: 63,000 c.y. (t0 ac.j @ $1.00 c.y. $63,000 <br />Seed for disturbed areas per 10 ac. @ 530.00 / ac. 300 <br />563, 300 <br />Add tb% to the above figures, adjusted for inflation, for an independent contractor to <br />complete the work. <br /> <br />00039 <br />