Laserfiche WebLink
1.) tfud creek crossing - The crossing to be <br />constructed at mud creek should done in a manner that <br />does not constrict tl~e flow of the creek. any runoff <br />coming off of the roadway should be directed at.~ay from <br />the creek to prevent sedimentation. <br />There is a small wetland area on the east side of th=_ <br />cree}; that has developed due to irrigation runoff. <br />This Brea should be avoided not only to keen frcm <br />impacting `the wetland but also to avoid proble~s with <br />road stability. <br /> <br />nc1026 <br />