Laserfiche WebLink
<br />Attachment A <br /> <br />The following summarizes the reclamation activities undertaken at the C-b Tract site during the <br />1996 reporting year. <br />Partial reclamation activities were conducted at C-b Tract during the 1996 reporting period. The <br />Truck Scale and building were removed. The site was recountoured and covered with a minimum <br />of six inches of topsoil. This site and the topsoil stockpile will be reseeded during the spring. <br />The seed mix that will be used this spring has not yet been determined. Any seeding that will take <br />place during 1997 will be included on our 1998 reporting. <br />