Laserfiche WebLink
,. <br />RECEIVED <br />Radium Hill Group Annual Report FEB 2 8 2002 <br />Division of Minerals and Geology <br />Reseeding of all disturbed areas was conducted in January of 2001. Al] mines within the permitted area <br />were released except for the September Morn. <br />Reseeding of the September Morn was not successful. Umetco plans to construct a new seedbed and re <br />seed the site during 2002. <br />A map is not enclosed because there have been no new disturbed areas. <br />RECEIVED <br />MAR 1 1 1001 <br />Division of Minerals and Geology <br />