Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(13) <br />Mine: Southfield <br />NPDES ID. No.: Pond #5 '' <br />Inspection Period: 3rd-qtr 2001 <br />Inspection Date: August 21, 2001 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies north east of the main facilities area. <br />EMBANKMENT <br /> <br />1). Adequacy of the vegetative cover: Excellent odera Few Poor <br /> <br />2). Erosion forming Gullies: Extensive Some ew None <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No Ci <br /> At the principal spillway inlet? Yes No ~ <br />4). Erosion of the downstream toe of the embankment? Yes No c~ <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No ci <br /> Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes v <br />2). Is the inlet free of debris and restrictive material? Yes (~ <br />3). Is the discharge outlet free of restrictive material? Yes <br />4). Is erosion occurring at the discharge outlet? Yes <br /> Evaluate the severity: Extensive Moderate Just starting <br />No <br />No <br />No <br />No i~ <br />None <br />Page 1 of 2 <br />