. ~
<br />C~
<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />.._co;din~_ to C.n.S. 34-3_-i 10(3), and C.r^..5. 3!-~_'S-I ic(3)ta;, on the anniversary date of [he perrrtit tach year.
<br />the operator shall submit a report and a map showing the extent of current disturbances to affected land,
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur
<br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Report [he following information as required by 2 CCR 407-1, 407-4, and Rules
<br />1.13.7(1)(a):
<br />(i) the condition of the operation at the time of cessation:
<br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance
<br />standards and Environmental Protection Plan requirements, ifthey are part of your approved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and'Rules 1.15(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated
<br />statement regarding the sufficiency of the value of the financial wartanty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement,
<br />and-ti~ewalue'of the property 5~jecCto e`tlf-i'ef of'tliese instruments. a report shall also provide
<br />proof that there are no past-due property taxes.
<br />(i) Per the requirements of 2 CCR 407-], 407-4, and Rules 4,7{3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the farm
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed ten percent (109x) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4,9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.IS(I)(c), all monitoring information
<br />required as pan of the approved permit application, to include the Environmental Protection Plan. (Please
<br />note that if you are not a Designa[ed,Mining Operation, you will not have an Environmental Protection
<br />Plan as pan of your approved permii.)
<br />
<br />
|