Laserfiche WebLink
• ~~~ ~~~~~~~~~~~~~ ~~~ ,EC ~ ASSATES <br />9 T <br />6130 W. Vassar Way (/ <br />Lakewood, Colorado 60227 Mining & Enviror~ental Er~!n~~ring~ <br />n.. <br />"T291tp¢one (303) 9651527 <br />Fax (303)985-1532 <br />E-mail: jmbeckpe~AOL.com <br />June 4, 1999 <br />Mr. Steve S. Shuey, Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />Mined Land Reclamation Division -Durango Field Office <br />484 Turner Drive, Building F -Suite 101 <br />Durango, Colorado 81301 <br />RE: West Tailing Drainage Plan Final Design <br />Camp Bird Mine (Permit No. M-82-090) <br />Dear Mr. Shuey: <br />DE(~!VER OFFICE <br />PUBLIC FILE COPY <br />FILE: M-~1-O q0 <br />SITE:C~~, B« <br />Received <br />.Ilty C i ;;. <br />Durango ric~~d Office <br />Division of A"instals ~ Geolory <br />On behalf of Camp Bird Colorado, Inc., I am enclosing two (2) copies of the Final <br />Design Report -West Tailing Impoundment Drainage Plan pursuant to the <br />outstanding condition (adequacy review) associated with Camp Bird Colorado, <br />Inc.'s Technical Revision No. 1 to the aforementioned permit. <br />Weather permitting, we intend to commence Phase I site reclamation activities <br />on Monday, June 7, 1999 with an anticipated project duration of about 3 to 4 <br />weeks. Accordingly, we have scheduled the culvert construction toward the end <br />of that period to accommodate your review/approval. <br />Please accept my apologies for the short time frame allowed. If you have any <br />concerns related to the enclosed final design, please make us aware in as timely <br />a manner to ensure continuity of the reclamation activities. If I can provide <br />anything further at this time, please don't hesitate to call me at (303) 985-1521. <br />Sincerely, <br />J. M. BECK & ASSOC/AYES <br />~-- <br />Y <br />~ M. Beck, P.E. <br />pal <br />cc: S. Butters <br />T. Rosemeyer <br />