Laserfiche WebLink
Require- <br /> Require- ment <br />Requirement ment complied Comment <br /> citation with ? lyes <br /> / nol <br />R. Sampling Table SA <br />frequency of of CDIvIG <br />ground water mining yes <br />monitoring permit C- <br />wells 81-023 <br />S. Para- <br />meters Table SA <br />to be of CDMG <br />analyze <br /> <br />d in mining yes <br />ground Permit C- <br /> 81-023 <br />water <br />sam les <br />T. Basic CWQCC ' <br />Standards regulation <br />for Ground s Y~ <br />Water 41.4 and <br /> 41.5 <br />U. Restoration <br />of ground Spoil springs may reduce ground water recharge by diverting <br />water CDMG ground water Flow to surface water Flow, but Chimney Rock's <br />recharge to regulation yes expected total aggregate spoil spring discharge of much less <br />approximate 4.05.11(3) than 1 cfs will be too small to reduce ground water recharge <br />premining below the approximate premining recharge rate. <br />rate <br /> The Fruitland formation is the only potential aquifer that will be <br /> impacted by mining. Sulfate-rich water from spoil aquifers can <br />V. Prevention of be expected to discharge into sandstone beds of the Fruitland <br />adverse formation in the unmined low-walls of the pits. The discharge <br />impacts to CDMG rates into the low-walls will be minimal due [o the low <br />ground water regulation yes permeability of the Fruitland sandstone beds, and the relative <br />systems 4.05.11 ease of spoil aquifer discharge over the crest of the low-walls (as <br />outside the spoil springs). The low rate of discharge of spoil aquifers into <br />permit area the low-walls, and the poor premining quality of Fruitland <br /> ground water, will probably result in no adverse impacts to <br /> round waters stems outside the ermi[ area. <br />W. Prevention <br />of impacts to <br />ground CDMG <br />The postmining land use of livestock grazing (and riparian habitat <br />water that regulation along Stollsteimer Creek) will not use ground water. <br />adversely s Yes Consequently, any impact to ground water will not impact the <br />impact the 4.05.1(2) <br />i <br />i d postmining land use in the permit area. <br />postm <br />n <br />ng an <br />land use 4.05.11 <br />within the <br />ermit area <br />Page 3 <br />