Laserfiche WebLink
~~ <br />pity ®f <br />®~~~~11 <br />January 17, 2006 <br />PLANNING & DEVELOPMENT <br />TEL: 303-384-8097 <br />PUBLIC WORKS <br />TEL: 303-384-8151 <br />Mr. Thomas Schreiner <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Annual Report <br />Empire Pit <br />Reclamation Permit No. M-1977-534 <br />Dear Mr. Schreiner: <br />144510'" ST. GOLDEN, CO 80401 <br />FAX: 303-384-8161 <br />www.cityofg of den.n et <br />Attached please find the annual report form and map for the Empire Pit. Golden <br />continued to make progress during 2005 to reclaim the site. Construction of the water <br />reservoir was completed in 2004 and the inlet structure and pipeline was constructed in <br />2005. In general, reclamation is complete on the west side of the site where the reservoir <br />and inlet structure are located. Approximately 6.5 acres were graded and seeded in the <br />fall after construction of the inlet structure and pipeline. An additional 2 acres were <br />revegitated based on inspection of seeding performed in 2004. In addition, noxious weed <br />control was completed in disturbed and recently revegitated areas. <br />There were no new disturbances in 2005 and none are planned for 2006. <br />The only disturbance remaining at the site is the material stockpile and associated <br />processing area located on the east portion of the permit area (see attached map). Efforts <br />to process and remove the materials stockplie continued in 2005. In May, the stockpile <br />was surveyed to set a baseline for volume calculations. The stockpile will be surveyed <br />annually to monitor the pace of material processing. Golden estimates that, to date, <br />Everist Materials has processed and sold approximately 140,000 cy of the stockpile. The <br />City of Golden hopes that processing will accelerate in 2006. <br />During 2005, the stockpile was retreated with Soiltac and a seed mixture to minimize <br />fugitive dust. In 2006, areas that were revegitated in 2005 will be re-seeded as necessary <br />and the stockpile will be retreated to minimize fugitive dust from the operation. <br />