Laserfiche WebLink
._ ~. <br />• <br />i <br />III IIIIIIIIIIIIIIII <br />STATE OFCOLORADO RiCHFRDD ~M.M Go.?ma' <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Stree[ <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Director <br />~J <br />September 1, 19[82 ~~"' ~~~~~® <br />CF&I Steel corporation a` 3~c(~ SEP 23 1982 <br />P. O. Box 847 ~ d <br />Canon City, Colorado 81212 <br />MINED LAND RECLAMATION <br />Celo. Dept. of Natural Resol!rce~ <br />Re: Annual Fees/File No. 77-376 <br />Based open our records, the anniversary date of your mining operation pernit is <br />9/22/78 and annual fees for the year(s) 81-82 totalling <br />$ 350.00 are due on that date. Fees are based upon a schedule of <br />$350.00 if the operation is an open mining operation of 10 acres or more and <br />$275.00 for any other operation 10 acres or more. <br />Also, to bring the Division up to date as to the mining and reclamation on the <br />site, please submit a report and map (to a scale of not Zess than Z00' to the <br />inch and not more than 660' to the inch), indicating the phases of the reclama- <br />tion plan which have been completed, correlated wi tz the timetable. The report <br />and map shall contain the foZIoo-iing information: <br />1) Location and number of acres affected during that year, <br />2) Locations and number of acres reclaimed for that year, <br />3) The location and number of acres in the various stages of reclamation <br />(backfilled, graded, topsoil replaced, revegetated), <br />4) The species of vegetation planted, the Locations and approximate dates <br />of planting, <br />5) The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used and Location of use, <br />6) An appraisal of the success of reclamation efforts, and in the event <br />of failure of any efforts, a short narrative ors the suspected or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided above shall be no more <br />than 45 days prior to the anniversary date. <br />• <br />