Laserfiche WebLink
Odober 12, 2004 <br />Bowie Resources Mine Subsidence <br />Survey date September-Odol~er 2004 <br />• LINE-24 Over the West Sub-Mains, Longwall Panels WD-1 + WD-2 <br />STA Date Node # Northing Fasting Elevation Description <br />24-A Nov 2002 1848 25809.66 29439.90 8040.23 REBAR-CAP <br /> July 2004 2319 25809.63 29439.93 8040.32 <br /> Sept 2004 2402 25809.65 29439.89 8040.38 <br />24-B Nov 2002 1834 25764.16 29245.74 8017.61 REBAR-CAP <br /> July 2004 2320 25764.17 29245.79 8017.66 <br /> Sept 2004 2403 25764.22 29245.75 8017.66 <br />24-C Nov 2002 1835 25532.11 28739.31 8029.11 REBAR-CAP <br /> July 2004 2321 25532.13 28739.32 8029.13 <br /> Sept 2004 2404 25532.17 " 28739.30 8029.11 <br />24-D Nov 2002 1836 25210.94 28446.85 8025.30 REBAR~AP <br /> July 2004 2245 25210.96 28446.89 8025.36 <br /> Sept 2004 2365 25210.99 28446.85 8025.36 <br />24-E Nov 2002 1837 24932.50 28431.94 8006.19 REBAR-CAP <br /> July 2004 2322 24932.47 28432.01 8006.14 <br /> Sept 2004 2405 24932.53 28431.99 8006.15 <br />24-F Nov 2002 1838 24507.26 28446.86 7972.42 REBAR-CAP <br /> July 2004 2323 24507.21 28447.13 7972.41 <br />• Sept 2004 2406 24507.26 28447.10 7972.38 <br />24~ Nov 2002 1839 24119.72 28523.51 7982.32 REBAR-CAP <br /> July 2004 2324 24119.72 28523.88 7982.28 <br /> Sept 2004 2407 24119.74 28523.87 7982.21 <br />Chance in position: July 2004 -> Sept 2004 <br />POINT # SURVEY # <br />Ju 2004 - Se 2004 BEARING DISTANCE EL1=V <br />24-A 2319 - 2402 N 72°18' W 0.05 + 0.06 <br />24-B 2320 - 2403 N 39°28' W 0.07 0.00 <br />24-C 2321 - 2404 N 36°15' W 0.04 - 0.02 <br />24-0 2245 - 2365 N 49°54' W 0.05 0.00 <br />24-E 2322 - 2405 N 19°02' W 0.06 + 0.01 <br />24-F 2323 - 2406 N 36°15' W 0.06 - 0.03 <br />24-G 2324 - 2407 N 12°16' W 0.02 - 0.07 <br />I <br />S3-8 <br />