Laserfiche WebLink
August 30, 2004 <br />Bowie No. 2 Mine Subsidence <br />Survey July 2004 <br />LINE-19 <br />Not Surveyed in October -November 2003 <br />STA gate Node # Northing <br />19-A Oct2002/ 1797 33595.43 <br /> Jury 2004, 2290 33595.33 <br />19-B Od2002/ <br />Ju <br />2004 1798 <br />2291 33147.42 <br />33147 <br />28 <br /> ry . <br />19~ Oct 2002 / 1799 32677.38 <br /> Jury 2004 / 2292 32677.09 <br />19-D Oct 2002 ''~/ 1800 32673.81 <br /> Jury 2004 J 2293 32673.44 <br />19-E Oct 2002 / <br />~ 1801 32479.00 <br /> July 2004 2294 32479.03 <br />Eastirg Elevation Descxiption <br />31770.36 7748.69 REBAR-CAP <br />3177o.ao n4s.83 <br />31928.04 7761.48 REBAR-CAP <br />31928.13 7761.54 <br />32208.03 7744.61 REBAR-CAP <br />32208.33 774x.48 <br />32811.20 7717.17 REBAR-CAP <br />32811.83 7746.74 <br />33302.36 7712.46 REBAR-CAP <br />33303.77 7709.97 <br />Chance in pasitiore Oct 2002 -~ July 2004 <br />POINT# SURVEY# <br />Oct 2002 - M 2004 BEARING DISTANCE ELEV <br />19-A 1797-2290 S 23°20' E 0.11 + 0.14 <br />19-8 1798-2291 S 33°41' E 0.16 + 0.06 <br />19~ 1799-2292 S 46°45' E 0.42 - 0.13 <br />19-0 1800-2293 S 59°31' E 0.73 - 0.43 <br />19-E 1801-2284 N 88°56' E 1.41 -2.50 <br />LINE-20 <br />Not Surveyed in October -November 2003 <br /> <br />20-A Oct 2002/ 1802 31949.45 33596.03 7704.65 REBAR-CAP <br />Jury2004/ 2295 31948.92 33596.63 7701.40 <br />20-8 Oct2002/ <br />~ 1803 31643.25 33951.07 7683.35 REBAR-CAP <br />Jury2004 2296 31641.69 33951.03 7677.65 <br />20-C Oct2002/ <br />/ 1804 31473.31 34406.48 7680.70 REBAR-CAP <br />July 2004 2297 31471.76 34406.54 7673.86 <br />Chance in position: Oct 2002 -> JuN 2004 <br />POINT# SURVEY# <br />Oct 2002 -Jul 2004 BEARING DISTANCE ELEV <br />20-A 1802-2295 S 48°10' E 0.80 - 3.25 <br />20-B 1803-2296 S 01 °39' W 1.56 - 5.70 <br />20-C 18042297 S 02°04' E 1.55 - 6.74 <br />S2-10 <br />