Laserfiche WebLink
0 °° ~ <br />0 Qoo <br /> <br />For: J. A. Kilter <br />March 23, 1994 <br />SECTION 16 FILL CONSTRUCTION UPDATE AND CERTIFICATION <br />On March 18, 1994 I accompanied Mr. James A. Kilter, Colowyo's reclamation <br />supervisor, on an inspection of the Section 16 Fill and interviewed Mr. Kilter about his <br />observations during it's construction. The purpose of this visit was to observe the condition of <br />the fill and to satisfy the requirements of CDMG Rule 4.09.1(11). Since the last inspection on <br />December 8, 1993 very little construction has taken place. A small amount of spoil remains to <br />be placed at the extreme upper end of the fill and sloped. Other than that, the fill is essentially <br />complete. <br />During the inspection, we observed that the rip-rap in the drainage channel that <br />had been bedded with smaller material was in good condition. <br />The small seep noted in prior inspections on the extreme east end of the fill was <br />not evident. <br />The fill exhibited no appearances of instability, structural weakness, or other <br />hazardous conditions. <br />I am a mining engineer, registered in the State of Colorado, and experienced in <br />the construction of earth and rock fill embankments. Mr. Kilter is employed by Colowyo as a <br />reclamation supervisor and he personally observed the conswction of the Section 16 Fill and <br />particularly the topsoil placement and seeding. <br />