FOIDEL CREEK MINE
<br />SITE 115 METER READINGS
<br />•
<br />
<br />1993 WATER YEAR
<br />DATE NORTH SOUTH
<br />09/29/92 69,323,400 57,339,100(locked)
<br />11/03/92 71,394,500 (locked) 60,785,650
<br />12/01/92 71,394,500 64,780,100
<br />01/05/92 71,394,500 66,587,400
<br />02/01/93 71,394,500 68,729,600
<br />03/01/93 71,394,500 72,956,300
<br />04/05/93 71,394,500 75,335,300
<br />05/03/93 71,394,500 77,586,400
<br />06/01/93 71,394,500 85,094,500
<br />06/14/93 71,394,500 90,503,300
<br />(The pumps were pulled for repairs in late June, 1993)
<br />07/09/93 71,550,500 91,722,400 (locked)
<br />07/28/93 73,306,500 92,101,200
<br />09/01/93 74,306,500 (locked) 96,200,500 (meter rolled over)
<br />10/04/93 00,000,000 (locked, new meter) 07,120,900
<br />~~83/00
<br />y? 6609 00
<br />l 2U~JJ~
<br />7~
<br />!19~7s~8o a
<br />y 9s
<br />S~76f 90
<br />y
<br />~•
<br />
|