My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03302
DRMS
>
Back File Migration
>
Report
>
REP03302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:07 PM
Creation date
11/26/2007 10:28:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977062
IBM Index Class Name
Report
Doc Date
3/22/1993
Doc Name
110 2 ANNUAL FEE INVOICE & REPORT REQUEST
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Notice of Intent to Continue Mining Operatio ns RECE~~ED <br /> 110(2)~'Annua'1 Report <br />MAR <br /> 22 1993 <br />Permittee Name: Benson Brothers <br />m <br />~. O D'v'S~onur <br />Ope <br />atio <br />Name: Hallen <br />beck Pit No 1' Mif1efd'S~Geology <br />Anniversary Date: 04!02/93 <br />Total: $175.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES (NO) <br /> Does this mine operate MORE or LESS than 180 days per year? MORE (LESS) <br />2a. financial Warranty: $ 2500.00 Zb. Permitted acreage: 8.32 <br />3. Does this mine have a phased reclamation plan? (YES) NO <br />4. Total acres affected during the report year:` .29 <br />5. Total acres reclaimed for the report year:" N/A <br />6. Total acres in various stages of reclamation:' <br /> a. Backfilled: crone d. Topsoil replaced : None <br /> b. Graded: crone Average topsoil thickness <br /> c. Seeded: None replaced: None <br /> List species seeded & seeding <br /> rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic mat erial or soil <br /> conditioners used for the report year:' None <br />B. Estimated total acres to be affected in the next report year: ' •so <br />9. COMMENTS: <br />' Please show the locatron or the acreage for items 4 - 6 on your map'*. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: Date: March S 199'i <br />Please type or print current contact name, mail' address, and phone number below <br />COntdCt Name: Dwie,ht D. Benson Phone: (303 ) A35-3128 <br />Company: B_e_nson Brothers <br />Address: 2138 J-50 Road: Austin. CO 81410 <br />Federal Tax ID No. or Social Security No.: _ <br />)'`" Iq3 ~I <br />
The URL can be used to link to this page
Your browser does not support the video tag.