'~.r .~ ~ fr;7 4~
<br />I t
<br />r u al
<br />-, if A f ~tl f.+~~ ...J I~
<br />k ,J
<br />ANNUAL, REPOR'C
<br />INSTRUCTIONS
<br />
<br />Accordine to C.RS. 3-1-3~-I Iti(~). and C.R.S. =-L-i~.~-I 16(3)~aL on the ,tnni~zrsary datz of thr. permit zach year.
<br />the operator shall submit a repon mid a map ,howin~ [he extent of current disturhances to affected land.
<br />reclamation accomplished to date and during the precedine }'ear. new disturbances that are anticipated to occur
<br />during [hz upcoming year, and reclamation that will be perfonnzd dunn~ the upcoming yzar. Plzasz auach such
<br />a repon and map tr enclosed annual repon form. (An adequatzly labeled map that clearly delineates and includes
<br />thz ahoce elements may ,office for a written repon.[
<br />[f your operation is subject to the provisions of Tzmponrr Cessauon ^s dchned in the Act and Rules. you must
<br />provide with the Annual Ripon thz following information as required by 3 CCR 407-I. 407-4, and Rules
<br />(il the condition of the operanon at thz time of cessatir'n:
<br />(ii) what >pecitic measures have been and will be implemzntzd to compl} with reclamation, perfotmanez
<br />standards and Environmental Protection Plan requirements, if they are part of your approved application: and
<br />(iii) plans for resumption of mining operations.
<br />Phase provide the additional following infottnation with your Annual Report, as applicablz:
<br />ia) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1 ~(I ). provide an updated statement
<br />regarding [he sufficiency of the value of [he Financial Warranty, spzcifically:
<br />(i t Pzr the requirements of 2 CCR 407-1, 407-4, and Rules I.I ~(l )fa), provide an updated
<br />statement regarding the sufficiency of the valuz of the financial warranty. Specifically,
<br />irrevocable letters of crzdit, Dezds of "Crust, and security a,reements, self-insurance, salvage
<br />credit, and first priority liens on project related fi.etures.
<br />(ii) Pzr the requirements oF? CCR 407-1, =407-4, and Rules I.I~(I)(b). permits secured with a
<br />Deed of Trust or a Security Aareemznt, thz operator shall submit an updatz, by a qualified
<br />indepzndznt appraiser, indicating any changes in propeny value, and a statement summarizing
<br />any circumstances which may affect the adequacy of [he Dezd of Trust, or Security agrzement.
<br />and the value of thz propeny subject to either of these ins[rumznts. Thz report shall also provide
<br />proof that there arz no past-due property taxis.
<br />(i) Pzr the requirements of_ CCR 407-1, 407-4, and Rules -1.7(31, permits secured with an
<br />hTevocable Lzttzr of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Czrtified Public Accountant, demonstrating that the Lettzr of
<br />Credit does not zxceed ten percent (10901 of the bank's capital surplus accounts.
<br />( i 1 Pzr [he requirements of ?CCR-107-I, -107-4. and Rules 4.9. ~(c), permits secured by a First
<br />Priority Lten on am' tistures and Equipmznt, the operator shall provide a report in sufFicient
<br />deutil to fully describe the condition, valuz, and location of a!! plzdged fixtures and equipment.
<br />tb) Per the reyuirzmen[s of 2 CCR 407-1.407-4, and Rules I.l i(1 i(c), all monitoring information
<br />required as patt of the approved permit application, to include the Environmental Protection Plan. (Phase
<br />note that if you arz no[ a Desi,nated Ivlinin, Opzrttion. you will not have an Environmental Protection
<br />Plan ^s part of your approved permit.)
<br />
|