Laserfiche WebLink
BVRON J. 8 LALANI R. WEATHERS PARE 2 <br />WEATHER MINE ill - 2000 ANNUAL REPORT <br />M-99-069 <br />NOVEMBER t 4, 2000 <br />11(cont) and partially mine. Topsoil has been stockpiled for use when <br />reclamation begins along the east side of the site and the south <br />side of the new area (brown). We estimate there are 43,000 cy of <br />topsoil in the pile at this time. The exterior elopes are con- <br />tinuing to be mined to their final rate of 3h to lv. Mining will <br />continue next year in areas previously disturbed and may expand <br />as the demand for material increases. if needed, additional area <br />will be stripped adjacent to the mining area and the topsoil will <br />be saved for use in reclamation. No reclamation is required at <br />this time other that the bank sloping. This has been successful. <br />