Laserfiche WebLink
• <br />• UNDERGROUND <br />ENGINEERWG & <br />ENVntONMENTAL <br />SOLUTIONS <br />Haley k Aldrich, Inc. <br />1600 Broadway, Suite 7125 <br />Denver, CO 80202-0911 <br />Tel: 303$32.91;36 <br />Far 303.832.9616 <br />Email: DEN n HalcyAldrich.com <br />26 September 1997 <br />File No.: 20220-002 <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street <br />Room 215 <br />Denver. CO 80203 <br />R~CFIV~D <br />SEP 2 9 1997 <br />Divi~;cn ~~ ,,,,~~~~~,~s a uccio~y <br />Attention: Mr. Gary Curtiss <br />Subject: 1997 Annual Report <br />Bromley Lakes Pit, DMG File No. M-87-049 <br />Brighton, Colorado <br />Dear Mr. Curtiss: <br />The Notice of Intent to Continue Mining Operations (112 Annual Report Form) and Annual <br />Report Map for the subject aggregate mine is attached. <br />Highlights from the 1997 Reporting Year (year ending 29 September 1997) included the <br />following: <br />^ Active mining was concentrated in an approximately 12 acre area south of the existing <br />open lake at the northeast corner of the site (current Phase 4). Mining was focused on <br />this area to complete mining sooner adjacent to a planned residential development to <br />the east. <br />OFFICES ^ The site landowner changed from the Calvert and White families to the City of <br />Boston Brighton without affecting the original mining lease terms. The City plans open space <br />Mnssnihuserfs and, possibly, water storage at the site following mining. <br />Cleveland <br />Olriu <br />Hartford <br />Comu•cticur <br />Los Angeles <br />Culifurnin <br />Manchester <br />NcRn Hmrrpshire <br />Portland <br />Mnine <br />Rochester <br />Nrw lurk <br />Sin Francisco <br />CnltforNin <br />Washington <br />Di;h~icf o(Coluruhin <br />^ The McCann ditch was further relocated to its planned final location south of the <br />existing open lake at the northeast corner of the property. The ditch currently flows <br />into the open lake which in turn flows back into the original ditch at the northwest <br />corner of the lake. <br />^ Reclamation was limited to the north side of Phase 3A (completed during the reporting <br />year. Fall 1997 reclamation grading is planned for the east sides of Phase 3A and <br />Phase 4. <br />G:~PROIFrISV 0250\9l ANNCOV.L'IR <br />r~~w,~ mmrdrm+ <br />