Laserfiche WebLink
I ~ I <br />• PROJECT DESCRIPTION <br />The Colowyo Coal Company, L.P. (Colowyo) mine is a multiple seam surface <br />mining operation. The East Pit has been in operation approximately 18 years. Initial <br />excavations have begun for the West Pit which will be mined down through F-Seam <br />coal. The Streeter Pit area will be mined down through the X-Seam. The relative <br />locations and extent of these mine areas are shown on Fig. 1. Atypical section <br />showing the north wall of the West Pit and coal seam locations and dip is shown on <br />Fig. 2. There is no known underground mining near the West PR or Streeter Pit <br />areas. <br />Auger mining of the X-Seam is under consideration both in the West Pit and <br />the Streeter Pit. As the West Pit initial box cut is deepened, the C or D-Seam and the <br />E-Seam are planned for auger mining. Proposed auger diameters include 5, 6 and <br />7 foot circular diameter augers. Preliminary recommendations are provided for a <br />• rectangular miner method with a 13 foot width and adjustable height. The anticipated <br />depth/penetration of the circular augers is on the order of 300 to 500 feet. <br />The initial box cut for the West Pit will extend through the F-Seam to depths <br />on the order of 350 feet. The proposed location and configuration is shown on Fig. <br />1. Excavation through the Y-Seam has been completed to the extent shown as of <br />September, 1995. The north wall of the West Pit will consist of a 250 foot high <br />section from the X-Seam floor to the F-Seam floor. Above this slope the X and Y- <br />Seam cuts will be stepped back as illustrated on Fig. 2. The excess spoil pile will be <br />located to the north of the north wall slope. The toe of the slope will extend as close <br />as possible to the slope based upon stability considerations. <br />The east wall of the box cut will be approximately 350 feet high (Y-Floor to F- <br />Floor) and the Y-Toe cut will be closer than for the north wall (Fig. 2). The excess <br />spoil pile will not influence the east or west walls of the West Pit. <br /> <br />COLOWYO GOAL COMPANY, L P. <br />CTLrT 2],SBS 2 <br />