Laserfiche WebLink
<br />i <br />overburden conditions should be confirmed for the auger spacing and penetration <br />planned. We believe this study was performed using methods and procedures <br />consistent with other professionals practicing geotechnical engineering in this area <br />at this time. No other warranty, express or implied, is made. <br />It has been our pleasure to serve you on this project. If we can clarify our <br />opinions or be of further service in discussing the contents of this report, please call. <br /> <br />' . . <br /> <br />• <br />Mark G/Gray, P.EC <br />Project Manager ~ <br />' ;.,fit,,,, <br />o •, t <br />. ;~ °;, <br />~` , <br />.r. <br />Darrel V. Holmquist, P.E. <br />President <br />MGG:DVH/edd <br />(4 Copies Sent) <br />• <br />GOLOWYO GOAL COMPANY, L P. <br />CTL"f 27,585 <br />