My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03136
DRMS
>
Back File Migration
>
Report
>
REP03136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:59 PM
Creation date
11/26/2007 10:25:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Report
Doc Date
6/25/1996
Doc Name
SUBSIDENCE MONITORING BEAR COAL CO BEAR MINE 3 SOMERSET COLO
From
UTE ENGINEERING & SURVEYING CO
To
BEAR COAL CO
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bear Coal Company <br />6 June 20, 1996 <br />During the June, 1995 survey two new subsidence stations were es- <br />tablished. These stations will be referred to as U28 and U29. <br />See map for location. These stations are ~'6 rebar with 2-inch <br />aluminum caps. <br />The values for these stations are as follows: <br />Northing Easting Elevation <br />U28 398,859.27 1,441,903.60 7702.50 <br />U29 398,641.37 1,440,785.49 7419.98 <br />These stations will not be monitored in the regular subsidence <br />surveys. This area is to be visually inspected for signs of sub- <br />sidence. Should there be any noticeable signs of subsidence, UTE <br />will then be instructed to monitor U-28 and U-29 and then calcu- <br />late any relative movement. <br />Relative movement between surveys is shown in the following <br />Tables. <br />Table 4 Subsidence - Relative Movement <br />Period of November, 1995 to June, 1996 <br />Table 5 Subsidence - Lone Pine Gulch <br />Period of November, 1995 to June, 1996 <br />TABLE 4-SUBSIDENCE <br />SUBSIDENCE POINT CHANGES - RELATIVE MOVEMENT <br />NOVEMBER, 1995 TO JUNE, 1996 <br />Point Horizontal Distance Bearing Elevation <br />No. <br />U10 0.29 N03°40'E -0.02 <br />U11* Not Tied In This Survey <br />U21 0.16 S83°34'E +0.81 <br />U22 0.08 N82°17'E +0.79 <br />*U11 See Note Page 3 about target pole <br />
The URL can be used to link to this page
Your browser does not support the video tag.