Laserfiche WebLink
INSPECTION REPORT - SEDIMENT PONDS <br />DISCHARGE POINT 001 - STREETER FILL SEDIMENT POND <br />Date of Inspection: 1,?s•9/ <br />Are all eatban]®ents, spillways and dewatering devices in order <br />as per the certified design? ~s <br />If no, explain: <br />DISCHARGE POINT 002 - WORK AREA POND • <br />Date of Inspection: .~.~~`• 9/ <br />Are all embanlonents, spillways and dewatering devices in order <br />as per the certified design? ____~_ <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: 1.x.5.9/ <br />Are all embanlonents, spillways and dewatering devices in order <br />as per the certified design? y <br />Zf no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: ~.~.5 9/ <br />Are all embanlonents, spillways and dewatering devices in order <br />as per the certified design? ~s <br />If no, explain: <br />DISCHARGE POINT 005 - STOKER COAL LOADOUT POND <br />Date of Inspection: ,?•.?19/ <br />Are all eatban]Onents, spillways and dewatering devices in order <br />as per the certified design? ~s <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP <br />Date of Inspection: .~.T.S• 9/ <br />Are all embanlanents, spillways and dewatering devices in order <br />as per the certified design? ~_ <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: .7~.f• 9/ <br />Are all embanlonents, spillways and ewatering devices in order <br />as per the certified design? ~ <br />If no, explain: <br />Signed: ~~i~/ ~~A <br />Date: ~.~/ 9/ <br />