Laserfiche WebLink
I, <br />I' <br />i~ <br />III. AREAS MINED IN 2001 <br />3.01 Central Quarry <br />By December 2001, mining in Central Quarry was complete with a water transmission line <br />installed along the road on the west side of the quarry. <br />3.02 North Quarry <br />During 2001, mining was completed within the north and east sections of the North Quarry <br />on Benches 5 and 4. Final highwall was completed on the north side on Bench 4, to <br />approximate elevation 6,595 ft. Mining continues within the central and eastern parts of the <br />in North Quarry on Benches 3 and 2. Mining has generally continued in a sequence of 60-fr <br />highwalls with benches 40 ft to 70 ft wide. <br />G:\PROJECTS\_02W Morrison QuurrV\OON\?001\Repnn\_IX)I eeo~echnical adJendum.rloc <br />3 <br />