My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-08-31_REPORT - M1990144
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1990144
>
2005-08-31_REPORT - M1990144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:33:06 AM
Creation date
11/26/2007 10:23:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990144
IBM Index Class Name
Report
Doc Date
8/31/2005
Doc Name
Annual Fee/Report/Map
From
Lafarge West Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
otice of Intent to Continue Mining Operations <br /> 112c Construction Materials Annual Report <br /> ~~ <br />Permit tee Name: Lafarge West, Inc. ~~~ <br />Permit No: M-1990-144 ~ <br />,1 /~ <br />ry~ <br />~ <br />Operat ion Name: Fillmore Pit p~. <br />/y a6b7 <br />v 3 <br />Anniversary Date: , <br />June 15, 2005 <br />~S~O°°? ?Qj~, <br />M <br />~ <br />Total: $688.00 (Due on your Anniversary Date) ~°e, <br />J <br /> Cep? <br />1. a. Permitted acreage: 84.0 b. County where mine is located: OBp <br />PUeblo <br />2. Has this min e been granted TEMPORARY CESSATION STATUS? NO <br /> Does this mi ne operate MORE or LESS than 180 days per year? Less <br />3. Does this mi ne have a phased reclamation plan? NO <br />4. Total acres affected during the report year:* +/_30 <br />5. Total acres reclaimed for the report year:* 0 <br />6. Total number of acres in topsoil replacement stage: 12 <br /> a. Average thickness of topsoil replaced 6" <br />7. Total number of acres seeded: 0 <br /> a. List species seeded and seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: Nq <br /> a. Date reclamation began: 1995 <br />9. The type and approximate quantity of fer tilizers, organic material or soil <br /> conditioners used for the report year:* None <br />10. Estimated total acres to be affected in the next report year:* +/-0.5 <br />11 . COMMENTS : In the prDCess Of reClafTlatlOn and Selllnq OUt Of StOCkpIIBS. <br /> <br /> <br />* Please show the location of the acreage for items 4-6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~) ~Q~' ~Q~~ ~ ,~~ Date 8/11/2005 <br />0 <br />Please type or print current contact name, mailing address, and phone number below: <br />contact Name: Eric Reckentine <br />company: Lafarge West, Inc. <br />Address: ~~~~ ~NUV~+ RaµoL+Wayr Svife2Oo <br />~.estu,(u~(;0 80021 <br />Phone: 303-657-4330 <br />FAx No : 303-657 L{ O 3 j <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.